007-Y崛?囿wenglish(doc)
綜合能力考核表詳細內(nèi)容
007-Y崛?囿wenglish(doc)
File No.: CNCA—01C—007:2001 IMPLEMENTION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Switches for Circuit, Installation Protective and Connection Devices Thermal-links Announced on Dec.7, 2001 Implemented on May 1, 2002 Certification and Accreditation Administration of People’s Republic of China CONTENTS 1. SCOPE 3 2. CERTIFICATION MODEL 3 3. MAJOR PROCESSES OF CERTIFICATION 4 3.1 APPLICATION FOR CERTIFICATION 4 3.2 TYPE TESTING 4 3.3 INITIAL INSPECTION OF THE FACTORY 4 3.4 EVALUATION OF CERTIFICATION RESULTS AND APPROVAL OF CERTIFICATION 4 3.5 FOLLOW-UP INSPECTION 4 4. GENERAL REQUIREMENTS FOR CERTIFICATION 4 4.1APPLICATION FOR CERTIFICATION 4 4.2 TYPE TESTING 5 4.3 INITIAL INSPECTION OF THE FACTORY 6 4.4 EVALUATION OF CERTIFICATION RESULTS AND APPROVAL OF CERTIFICATION 7 4.5 FOLLOW-UP INSPECTION 8 5. CERTIFICATE 10 5.1 THE MAINTENANCE OF THE CERTIFICATES 10 5.2 EXTENSION OF CERTIFIED PRODUCTS 10 5.3 THE SUSPENSION, CANCELLATION AND WITHDRAWAL OF THE CERTIFICATES 11 6. USE OF THE MARKS FOR COMPULSORY PRODUCTS CERTIFICATION 11 6.1 DESIGN OF THE MARK ALLOWED TO USE 11 6.2 DERIVATIONS OF CERTIFICATION MARK 11 6.3 WAYS OF USE 11 6.4 LOCATION OF THE MARK 11 7. CHARGE 12 APPENDIX 1 13 APPENDIX 2 14 IMPLEMENTION RULES FOR COMPULSOEY CERTIFICATION OF ELECTRICIAL AND ELECTRONIC PRODUCTS Switches for Circuits, Installation Protective and Connection Devices Thermal-links 1. Scope This document applies to thermal-links, intended for incorporation in electrical appliances, electronic equipment and component parts thereof, normally intended for use indoors, in order to protect them against excessive temperatures under abnormal conditions. This document may be applicable to thermal-links for use under other than indoor conditions, provided that the climatic and other circumstances in the immediate surroundings of such thermal-links are comparable with those in this program. This document may also apply to thermal-links in their simplest forms (e.g. melting strips or wires), provided that molten materials, expelled during function, cannot adversely interfere with the safe use of the equipment, especially in the case of hand-held or portable equipment irrespective of its attitude. This document is applicable to thermal-links with a rated voltage not exceeding 660V a.c. and a rated current not exceeding 63A.This document is applicable to thermal-links primarily intended for use in circuits operating on a.c. with a frequency between 45Hz and 62Hz. 2. Certification model Type testing + Initial inspection of the factory + Follow-up inspection 3. Major processes of certification 1 Application for certification 2 Type testing 3 Initial inspection of the factory 4 Evaluation of certification results and approval of certification 5 Follow-up inspection 4. General requirements for certification 1 Application for certification 4.1.1 Defining application unit for certification In principle, application unit is defined on the basis of the same kind, constructions and materials. In one application unit, the samples with the highest functioning temperature (Tf), middle Tf and the lowest Tf should be chosen for type testing and cover other samples in the whole range, from the lowest to the highest temperature. In principle, the product of same model/type and same manufacturer but with different factories shall be defined into different application unit. 4.1.2 Application documents The formal application shall be submitted with the following documents: 1) Product assembly chart, circuit diagram; 2) List of critical components and/or materials 3) Description of the difference between the different model/type of products in the same application unit. 4) Other necessary documents. 4.2 Type testing 4.2.1 Sample delivery for type testing 4.2.1.1 The principles of sample delivery for type testing In one application unit, the samples with the highest Tf, middle Tf and the lowest Tf should be chosen to test and cover other samples in the whole range, from the lowest to the highest temperature. 4.2.1.2 Samples quantity/amount requirements The applicants shall take responsibility of sample delivery for type testing in accordance with the requirements of the certification body and be responsible for them. Quantities of samples required: 1) Models with different current, voltage, functioning temperature (Tf): 60 pieces for each specification 2) In one application unit : 60 pieces for samples with the highest Tf; 60 pieces for samples with the middle Tf; 60 pieces for samples with the lowest Tf 3) Enclosure and sealing materials: 5 pieces for each material (not less than 15mm(15mm (3mm) 4.2.1.3 Handle of samples and relating documents after type testing The samples tested and/ or the relating documents should be handled in appropriate ways after type testing. 4.2.2 Test standards, items and methods for type testing 4.2.2.1 Test standards GB9816-98 “Thermal-links – Requirements and application guide” 4.2.2.2 Test item The type testing shall be carried out according to total items and methods specified in the standards. 4.2.2.3 Test methods The type testing shall be carried out according to the methods specified and / or referred in the standards and /or the standards. 4.3 Initial inspection of the factory 4.3.1 Contents of the inspection The contents of factory inspection shall include the factory quality assurance ability assessment and the products consistency check. 4.3.1.1 Assessment of factory quality assurance ability The inspector assigned by the certification body shall carry out the factory quality assurance capability assessment according to the Requirements for Factory Quality Assurance Ability (see appendix 2) and the additional inspection requirements stipulated by CNCA. In addition, the inspection shall cover the requirements of Testing Requirements for Factory Quality Control of Thermal-links (see Appendix 1). 4.3.1.2 Check of consistency of the product The consistency of the product applying for certification shall be checked on the site of production. If more than one application unit are involved in the certification, at least one type/model sample shall be taken from each unit for the product consistency check. The following major points shall be checked: 1) The name of product, type/model and specification on the nameplates and package of products to be certified shall be identical with those indicated in the type testing reports. 2) The construction of products to be certified shall be identical with those of the samples for type testing. 3) The critical components and materials shall be identical with those declared in type testing and confirmed by certification body. The witness tests, if necessary, should be carried out to confirm the performance of safety of the products during the inspection. 4.3.1.3 Inspection Scope All the products to be certified and processing promises shall be covered for inspection of factory quality assurance ability and of consistency of the products. 4.3.2 Timing of factory inspection Normally, the initial inspection should be implemented after the sample has passed the type testing. The type testing and factory inspection can be implemented at the same time in special cases. The duration of factory inspection shall be determined by the amounts of application units of products to be certified and with the consideration of the scale of the factory. It will normally take about 1 to 4 man-day for each processing premises. 4.4 Evaluation of certification results and approval of certification 4.4.1 Evaluation of certification results and approval of certification The certification body shall be responsible for a general evaluation of the results of type testing and factory inspection and for issuing the certificates to the applicants for the conformed products. One certificate shall be issued for one application unit. The application of the certificates shall comply with the requirements for Regulations for Compulsory Product Certification. 4.4.2 Time frame The time frame for certification means the working days from the acceptance of complete application till the issuance of the certificates, which includes the time of type testing, factory inspection, reports submission after inspection, evaluation of certification results and approval of certificates, etc. Normally, type testing takes 65 working days, not including the time for corrective actions and retest of the non-conformity item(s). The inspection reports should be submitted within 5 working days after inspection. It will be counted from the day when the inspectors complete the inspection on site and receive from the factory the corrective action reports on non-conformities satisfying the requirements. Evaluating certification results and approving the certificates shall normally be within 5 working days. 4.5 Follow-up inspection 4.5.1 The frequency of follow-up inspection The follow-up inspection shall be implemented for once per year. The first follow-up inspection shall normally be implemented 12 months after the certificates being granted. The frequency of surveillance should be increased in any of the following cases: 1) The quality of the certified product has seriously problems, or received by clients and checking concludes that the holder of the certificate shall be responsible for it. 2) The certification body doubts the conformity of the certified product against the requirements for standards of safety with sufficient reasons. 3) Sufficient information indicates that the conformity or the consistency of certified products woul...
007-Y崛?囿wenglish(doc)
File No.: CNCA—01C—007:2001 IMPLEMENTION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Switches for Circuit, Installation Protective and Connection Devices Thermal-links Announced on Dec.7, 2001 Implemented on May 1, 2002 Certification and Accreditation Administration of People’s Republic of China CONTENTS 1. SCOPE 3 2. CERTIFICATION MODEL 3 3. MAJOR PROCESSES OF CERTIFICATION 4 3.1 APPLICATION FOR CERTIFICATION 4 3.2 TYPE TESTING 4 3.3 INITIAL INSPECTION OF THE FACTORY 4 3.4 EVALUATION OF CERTIFICATION RESULTS AND APPROVAL OF CERTIFICATION 4 3.5 FOLLOW-UP INSPECTION 4 4. GENERAL REQUIREMENTS FOR CERTIFICATION 4 4.1APPLICATION FOR CERTIFICATION 4 4.2 TYPE TESTING 5 4.3 INITIAL INSPECTION OF THE FACTORY 6 4.4 EVALUATION OF CERTIFICATION RESULTS AND APPROVAL OF CERTIFICATION 7 4.5 FOLLOW-UP INSPECTION 8 5. CERTIFICATE 10 5.1 THE MAINTENANCE OF THE CERTIFICATES 10 5.2 EXTENSION OF CERTIFIED PRODUCTS 10 5.3 THE SUSPENSION, CANCELLATION AND WITHDRAWAL OF THE CERTIFICATES 11 6. USE OF THE MARKS FOR COMPULSORY PRODUCTS CERTIFICATION 11 6.1 DESIGN OF THE MARK ALLOWED TO USE 11 6.2 DERIVATIONS OF CERTIFICATION MARK 11 6.3 WAYS OF USE 11 6.4 LOCATION OF THE MARK 11 7. CHARGE 12 APPENDIX 1 13 APPENDIX 2 14 IMPLEMENTION RULES FOR COMPULSOEY CERTIFICATION OF ELECTRICIAL AND ELECTRONIC PRODUCTS Switches for Circuits, Installation Protective and Connection Devices Thermal-links 1. Scope This document applies to thermal-links, intended for incorporation in electrical appliances, electronic equipment and component parts thereof, normally intended for use indoors, in order to protect them against excessive temperatures under abnormal conditions. This document may be applicable to thermal-links for use under other than indoor conditions, provided that the climatic and other circumstances in the immediate surroundings of such thermal-links are comparable with those in this program. This document may also apply to thermal-links in their simplest forms (e.g. melting strips or wires), provided that molten materials, expelled during function, cannot adversely interfere with the safe use of the equipment, especially in the case of hand-held or portable equipment irrespective of its attitude. This document is applicable to thermal-links with a rated voltage not exceeding 660V a.c. and a rated current not exceeding 63A.This document is applicable to thermal-links primarily intended for use in circuits operating on a.c. with a frequency between 45Hz and 62Hz. 2. Certification model Type testing + Initial inspection of the factory + Follow-up inspection 3. Major processes of certification 1 Application for certification 2 Type testing 3 Initial inspection of the factory 4 Evaluation of certification results and approval of certification 5 Follow-up inspection 4. General requirements for certification 1 Application for certification 4.1.1 Defining application unit for certification In principle, application unit is defined on the basis of the same kind, constructions and materials. In one application unit, the samples with the highest functioning temperature (Tf), middle Tf and the lowest Tf should be chosen for type testing and cover other samples in the whole range, from the lowest to the highest temperature. In principle, the product of same model/type and same manufacturer but with different factories shall be defined into different application unit. 4.1.2 Application documents The formal application shall be submitted with the following documents: 1) Product assembly chart, circuit diagram; 2) List of critical components and/or materials 3) Description of the difference between the different model/type of products in the same application unit. 4) Other necessary documents. 4.2 Type testing 4.2.1 Sample delivery for type testing 4.2.1.1 The principles of sample delivery for type testing In one application unit, the samples with the highest Tf, middle Tf and the lowest Tf should be chosen to test and cover other samples in the whole range, from the lowest to the highest temperature. 4.2.1.2 Samples quantity/amount requirements The applicants shall take responsibility of sample delivery for type testing in accordance with the requirements of the certification body and be responsible for them. Quantities of samples required: 1) Models with different current, voltage, functioning temperature (Tf): 60 pieces for each specification 2) In one application unit : 60 pieces for samples with the highest Tf; 60 pieces for samples with the middle Tf; 60 pieces for samples with the lowest Tf 3) Enclosure and sealing materials: 5 pieces for each material (not less than 15mm(15mm (3mm) 4.2.1.3 Handle of samples and relating documents after type testing The samples tested and/ or the relating documents should be handled in appropriate ways after type testing. 4.2.2 Test standards, items and methods for type testing 4.2.2.1 Test standards GB9816-98 “Thermal-links – Requirements and application guide” 4.2.2.2 Test item The type testing shall be carried out according to total items and methods specified in the standards. 4.2.2.3 Test methods The type testing shall be carried out according to the methods specified and / or referred in the standards and /or the standards. 4.3 Initial inspection of the factory 4.3.1 Contents of the inspection The contents of factory inspection shall include the factory quality assurance ability assessment and the products consistency check. 4.3.1.1 Assessment of factory quality assurance ability The inspector assigned by the certification body shall carry out the factory quality assurance capability assessment according to the Requirements for Factory Quality Assurance Ability (see appendix 2) and the additional inspection requirements stipulated by CNCA. In addition, the inspection shall cover the requirements of Testing Requirements for Factory Quality Control of Thermal-links (see Appendix 1). 4.3.1.2 Check of consistency of the product The consistency of the product applying for certification shall be checked on the site of production. If more than one application unit are involved in the certification, at least one type/model sample shall be taken from each unit for the product consistency check. The following major points shall be checked: 1) The name of product, type/model and specification on the nameplates and package of products to be certified shall be identical with those indicated in the type testing reports. 2) The construction of products to be certified shall be identical with those of the samples for type testing. 3) The critical components and materials shall be identical with those declared in type testing and confirmed by certification body. The witness tests, if necessary, should be carried out to confirm the performance of safety of the products during the inspection. 4.3.1.3 Inspection Scope All the products to be certified and processing promises shall be covered for inspection of factory quality assurance ability and of consistency of the products. 4.3.2 Timing of factory inspection Normally, the initial inspection should be implemented after the sample has passed the type testing. The type testing and factory inspection can be implemented at the same time in special cases. The duration of factory inspection shall be determined by the amounts of application units of products to be certified and with the consideration of the scale of the factory. It will normally take about 1 to 4 man-day for each processing premises. 4.4 Evaluation of certification results and approval of certification 4.4.1 Evaluation of certification results and approval of certification The certification body shall be responsible for a general evaluation of the results of type testing and factory inspection and for issuing the certificates to the applicants for the conformed products. One certificate shall be issued for one application unit. The application of the certificates shall comply with the requirements for Regulations for Compulsory Product Certification. 4.4.2 Time frame The time frame for certification means the working days from the acceptance of complete application till the issuance of the certificates, which includes the time of type testing, factory inspection, reports submission after inspection, evaluation of certification results and approval of certificates, etc. Normally, type testing takes 65 working days, not including the time for corrective actions and retest of the non-conformity item(s). The inspection reports should be submitted within 5 working days after inspection. It will be counted from the day when the inspectors complete the inspection on site and receive from the factory the corrective action reports on non-conformities satisfying the requirements. Evaluating certification results and approving the certificates shall normally be within 5 working days. 4.5 Follow-up inspection 4.5.1 The frequency of follow-up inspection The follow-up inspection shall be implemented for once per year. The first follow-up inspection shall normally be implemented 12 months after the certificates being granted. The frequency of surveillance should be increased in any of the following cases: 1) The quality of the certified product has seriously problems, or received by clients and checking concludes that the holder of the certificate shall be responsible for it. 2) The certification body doubts the conformity of the certified product against the requirements for standards of safety with sufficient reasons. 3) Sufficient information indicates that the conformity or the consistency of certified products woul...
007-Y崛?囿wenglish(doc)
[下載聲明]
1.本站的所有資料均為資料作者提供和網(wǎng)友推薦收集整理而來,僅供學習和研究交流使用。如有侵犯到您版權(quán)的,請來電指出,本站將立即改正。電話:010-82593357。
2、訪問管理資源網(wǎng)的用戶必須明白,本站對提供下載的學習資料等不擁有任何權(quán)利,版權(quán)歸該下載資源的合法擁有者所有。
3、本站保證站內(nèi)提供的所有可下載資源都是按“原樣”提供,本站未做過任何改動;但本網(wǎng)站不保證本站提供的下載資源的準確性、安全性和完整性;同時本網(wǎng)站也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的損失或傷害。
4、未經(jīng)本網(wǎng)站的明確許可,任何人不得大量鏈接本站下載資源;不得復制或仿造本網(wǎng)站。本網(wǎng)站對其自行開發(fā)的或和他人共同開發(fā)的所有內(nèi)容、技術(shù)手段和服務擁有全部知識產(chǎn)權(quán),任何人不得侵害或破壞,也不得擅自使用。
我要上傳資料,請點我!
管理工具分類
ISO認證課程講義管理表格合同大全法規(guī)條例營銷資料方案報告說明標準管理戰(zhàn)略商業(yè)計劃書市場分析戰(zhàn)略經(jīng)營策劃方案培訓講義企業(yè)上市采購物流電子商務質(zhì)量管理企業(yè)名錄生產(chǎn)管理金融知識電子書客戶管理企業(yè)文化報告論文項目管理財務資料固定資產(chǎn)人力資源管理制度工作分析績效考核資料面試招聘人才測評崗位管理職業(yè)規(guī)劃KPI績效指標勞資關(guān)系薪酬激勵人力資源案例人事表格考勤管理人事制度薪資表格薪資制度招聘面試表格崗位分析員工管理薪酬管理績效管理入職指引薪酬設(shè)計績效管理績效管理培訓績效管理方案平衡計分卡績效評估績效考核表格人力資源規(guī)劃安全管理制度經(jīng)營管理制度組織機構(gòu)管理辦公總務管理財務管理制度質(zhì)量管理制度會計管理制度代理連鎖制度銷售管理制度倉庫管理制度CI管理制度廣告策劃制度工程管理制度采購管理制度生產(chǎn)管理制度進出口制度考勤管理制度人事管理制度員工福利制度咨詢診斷制度信息管理制度員工培訓制度辦公室制度人力資源管理企業(yè)培訓績效考核其它
精品推薦
- 1暗促-酒店玫瑰靜悄悄地開 369
- 2終端陳列十五大原則 382
- 3專業(yè)廣告運作模式 343
- 4****主營業(yè)務發(fā)展戰(zhàn)略設(shè)計 375
- 5中小企業(yè)物流發(fā)展的對策 394
- 6主顧開拓 482
- 7主動推進的客戶服務 342
- 8專業(yè)媒體策劃與購買 372
- 9中遠電視廣告CF 417
下載排行
- 1社會保障基礎(chǔ)知識(ppt) 16695
- 2安全生產(chǎn)事故案例分析(ppt 16695
- 3行政專員崗位職責 16695
- 4品管部崗位職責與任職要求 16695
- 5員工守則 16695
- 6軟件驗收報告 16695
- 7問卷調(diào)查表(范例) 16695
- 8工資發(fā)放明細表 16695
- 9文件簽收單 16695