008-外snglish(doc)
綜合能力考核表詳細(xì)內(nèi)容
008-外snglish(doc)
File No.: CNCA—01C—008:2001 IMPLEMENTION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Switches for Circuits, Installation Protective and Connection Devices Enclosures for Accessories for Household and Similar Fixed Electric Installations Announced on Dec.7, 2001 Implemented on May 1, 2002 Certification and Accreditation Administration of People’s Republic of China CONTENTS 1. SCOPE 3 2. CERTIFICATION MODEL 3 3. MAJOR PROCESSES FOR CERTIFICATION 4 3.1 APPLICATION FOR CERTIFICATION 4 3.2 TYPE TESTING 4 3.3 INITIAL INSPECTION OF THE FACTORY 4 3.4 EVALUATION OF CERTIFICATION RESULTS AND APPROVAL OF CERTIFICATION 4 3.5 FOLLOW-UP INSPECTION 4 4. GENERAL REQUIREMENTS FOR CERTIFICATION 4 4.1 APPLICATION FOR CERTIFICATION 4 4.2 TYPE TESTING 5 4.3 INITIAL INSPECTION OF THE FACTORY 6 4.4 EVALUATION OF CERTIFICATION RESULTS AND APPROVAL OF CERTIFICATION 7 4.5 FOLLOW-UP INSPECTION 8 5. CERTIFICATE 9 5.1 THE MAINTENANCE OF THE CERTIFICATES 9 5.2 EXTENSION OF CERTIFIED PRODUCTS 10 5.3 THE SUSPENSION, CANCELLATION AND WITHDRAWAL OF THE CERTIFICATES 10 6. USE OF COMPULSORY PRODUCTS CERTIFICATION MARK 10 6.1 DESIGN OF THE MARK ALLOWED TO USE 10 6.2 DERIVATIONS OF CERTIFICATION MARK 11 6.3 WAYS OF USE 11 6.4 LOCATION OF THE MARK 11 7. CHARGE 11 APPENDIX 1 13 APPENDIX 2 14 COMPLEMENTION RULES FOR COMPULSOEY CERTIFICATION OF ELECTRICIAL AND ELECTRONIC PRODUCTS Switches for Circuits, Installation Protective and Connection devices Enclosures for Accessories for Household and Similar Fixed Electric Installations 1. Scope This document applies to enclosures or parts of enclosures for accessories with a rated voltage not exceeding 440V intended for household or similar fixed electrical installations, either indoors or outdoors, and also applies to boxes intended for the mounting or suspension of luminaires. This document does not apply to enclosures for assemblies containing overcurrent protective devices, which are within the scope of IEC SC17D (switch and control appliances) nor to enclosures of the busbar trunking type. The enclosures include: 1) Surface mounting box 2) Flush mounting box 3) Semi-flush mounting box 4) Cover or cover-plate 2. Certification model Type testing + Initial inspection of the factory + Follow-up inspection 3. Major processes for certification 1 Application for certification 2 Type testing 3 Initial inspection of the factory 4 Evaluation of certification results and approval of certification 5 Follow-up inspection 4. General requirements for certification 4.1 Application for certification 4.1.1 Defining application unit for certification The units of application shall be defined according to the nature of the enclosure’s material, installation method, nature of installation, temperature range, maximum temperature, the protection degree against direct contact and harmful ingress of solid objects harmful ingress of water, and construction with or without suspension means. The products defined into one unit should be the same kind of products of same material and functions and of similar construction. In principle, the product of same model/type and same manufacturer but with different factories shall be defined into different application unit. 4.1.2 Application documents The formal application shall be submitted with the following documents: 1) Product assembly chart, circuit diagram; 2) List of critical components and/or materials 3) Description of the difference between the different model/type of products in the same application unit. 4) Other necessary documents. 4.2 Type testing 4.2.1 Sample delivery for the type testing 1. The principles of sample delivery for type testing Representative type shall be selected for type testing from the application unit. 4.2.1.2 Samples quantity/amount requirements The applicants shall take responsibility of sample delivery for type testing in accordance with the requirements of the certification body and be responsible for them. Quantities of samples required for type testing are: 6 for the representative model, 3 for each covered model. 4.2.1.3 Handle of samples and relating documents after type testing The samples tested and/ or the relating documents should be handled in appropriate ways after type testing. 4.2.2 Test standards, items and methods for type testing 4.2.2.1 Test standards GB17466-1998 “General requirements for enclosures for accessories for household and similar fixed electrical installations” 4.2.2.2 Test item The test items for safety shall include all appropriate items specified in standards. 4.2.2.3 Test methods The type testing shall be carried out according to the methods specified and / or referred in the standards and /or the standards. 4.3 Initial inspection of the factory 4.3.1 Contents of the inspection The contents of factory inspection shall include the factory quality assurance ability assessment and the products consistency check. 4.3.1.1 Assessment of factory quality assurance ability The inspector assigned by the certification body shall carry out the factory quality assurance capability assessment according to the Requirements for Factory Quality Assurance Ability (see appendix 2) and the additional inspection requirements stipulated by CNCA. In addition, the inspection shall cover the requirements of Factory Quality Control Testing Requirements of Enclosures for Accessories for Household and Similar Fixed Electrical Installations (see Appendix 1). 4.3.1.2 Check of consistency of the product The consistency of the product applying for certification shall be checked on the site of production. If more than one application unit are involved in the certification, at least one type/model sample shall be taken from each unit for the product consistency check. The following major points shall be checked: 1) The marking of the products to be certified shall be identical with those indicated in the type testing reports. 2) The construction of products to be certified shall be identical with those of the samples for type testing. 3) The critical components and materials shall be identical with those declared in type testing and confirmed by certification body. The witness tests, if necessary, should be carried out to confirm the safety performance of the products during the factory inspection. 4.3.1.3 Inspection Scope All the products to be certified and processing promises shall be covered for inspection of factory quality assurance ability and of consistency of the products. 4.3.2 Timing of factory inspection Normally, the initial inspection should be implemented after the sample has passed the type testing. The type testing and factory inspection can be implemented at the same time in special cases. The duration of factory inspection shall be determined by the amounts of application units of products to be certified and with the consideration of the scale of the factory. It will normally take about 1 to 4 man-day for each processing premises. 4.4 Evaluation of certification results and approval of certification 4.4.1 Evaluation of certification results and approval of certification The certification body shall be responsible for a general evaluation of the results of type testing and factory inspection and for issuing the certificates to the applicants for the conformed products. One certificate shall be issued for one application unit. The application of the certificates shall comply with the requirements for Regulations for Compulsory Product Certification. 4.4.2 Time frame The time frame for certification means the working days from the acceptance of complete application till the issuance of the certificates, which includes the time of type testing, factory inspection, reports submission after inspection, evaluation of certification results and approval of certificates, etc. Normally, type testing takes 30 working days, not including the time for corrective actions and retest of the non-conformity item(s). The inspection reports should be submitted within 5 working days after inspection. It will be counted from the day when the inspectors complete the inspection on site and receive from the factory the corrective action reports on non-conformities satisfying the requirements. Evaluating certification results and approving the certificates shall normally be within 5 working days. 4.5 Follow-up inspection 4.5.1 The frequency of follow-up inspection The follow-up inspection shall be implemented for once per year. The first follow-up inspection shall normally be implemented 12 months after the certificates being granted. The frequency of inspection should be increased in any of the following cases: 1) The quality of the certified product has seriously problems, or complained by clients and checking concludes that the holder of the certificate shall be responsible for it. 2) The certification body doubts the conformity of the certified product against the requirements for standards of safety with sufficient reasons. 3) Sufficient information indicates that the conformity or the consistency of certified products would be affected due to the changes in organization structure, production condition and the quality system of the manufacturers and/or factories. 4.5.2 Contents of the follow-up inspection The model of follow-up inspection: Re-assessment of factory quality assurance ability + check of consistency of products certified, and if necessary, samples may be taken and tested at the testing laboratories. The certification body shall implement the re-assessment of factories in accordance wi...
008-外snglish(doc)
File No.: CNCA—01C—008:2001 IMPLEMENTION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Switches for Circuits, Installation Protective and Connection Devices Enclosures for Accessories for Household and Similar Fixed Electric Installations Announced on Dec.7, 2001 Implemented on May 1, 2002 Certification and Accreditation Administration of People’s Republic of China CONTENTS 1. SCOPE 3 2. CERTIFICATION MODEL 3 3. MAJOR PROCESSES FOR CERTIFICATION 4 3.1 APPLICATION FOR CERTIFICATION 4 3.2 TYPE TESTING 4 3.3 INITIAL INSPECTION OF THE FACTORY 4 3.4 EVALUATION OF CERTIFICATION RESULTS AND APPROVAL OF CERTIFICATION 4 3.5 FOLLOW-UP INSPECTION 4 4. GENERAL REQUIREMENTS FOR CERTIFICATION 4 4.1 APPLICATION FOR CERTIFICATION 4 4.2 TYPE TESTING 5 4.3 INITIAL INSPECTION OF THE FACTORY 6 4.4 EVALUATION OF CERTIFICATION RESULTS AND APPROVAL OF CERTIFICATION 7 4.5 FOLLOW-UP INSPECTION 8 5. CERTIFICATE 9 5.1 THE MAINTENANCE OF THE CERTIFICATES 9 5.2 EXTENSION OF CERTIFIED PRODUCTS 10 5.3 THE SUSPENSION, CANCELLATION AND WITHDRAWAL OF THE CERTIFICATES 10 6. USE OF COMPULSORY PRODUCTS CERTIFICATION MARK 10 6.1 DESIGN OF THE MARK ALLOWED TO USE 10 6.2 DERIVATIONS OF CERTIFICATION MARK 11 6.3 WAYS OF USE 11 6.4 LOCATION OF THE MARK 11 7. CHARGE 11 APPENDIX 1 13 APPENDIX 2 14 COMPLEMENTION RULES FOR COMPULSOEY CERTIFICATION OF ELECTRICIAL AND ELECTRONIC PRODUCTS Switches for Circuits, Installation Protective and Connection devices Enclosures for Accessories for Household and Similar Fixed Electric Installations 1. Scope This document applies to enclosures or parts of enclosures for accessories with a rated voltage not exceeding 440V intended for household or similar fixed electrical installations, either indoors or outdoors, and also applies to boxes intended for the mounting or suspension of luminaires. This document does not apply to enclosures for assemblies containing overcurrent protective devices, which are within the scope of IEC SC17D (switch and control appliances) nor to enclosures of the busbar trunking type. The enclosures include: 1) Surface mounting box 2) Flush mounting box 3) Semi-flush mounting box 4) Cover or cover-plate 2. Certification model Type testing + Initial inspection of the factory + Follow-up inspection 3. Major processes for certification 1 Application for certification 2 Type testing 3 Initial inspection of the factory 4 Evaluation of certification results and approval of certification 5 Follow-up inspection 4. General requirements for certification 4.1 Application for certification 4.1.1 Defining application unit for certification The units of application shall be defined according to the nature of the enclosure’s material, installation method, nature of installation, temperature range, maximum temperature, the protection degree against direct contact and harmful ingress of solid objects harmful ingress of water, and construction with or without suspension means. The products defined into one unit should be the same kind of products of same material and functions and of similar construction. In principle, the product of same model/type and same manufacturer but with different factories shall be defined into different application unit. 4.1.2 Application documents The formal application shall be submitted with the following documents: 1) Product assembly chart, circuit diagram; 2) List of critical components and/or materials 3) Description of the difference between the different model/type of products in the same application unit. 4) Other necessary documents. 4.2 Type testing 4.2.1 Sample delivery for the type testing 1. The principles of sample delivery for type testing Representative type shall be selected for type testing from the application unit. 4.2.1.2 Samples quantity/amount requirements The applicants shall take responsibility of sample delivery for type testing in accordance with the requirements of the certification body and be responsible for them. Quantities of samples required for type testing are: 6 for the representative model, 3 for each covered model. 4.2.1.3 Handle of samples and relating documents after type testing The samples tested and/ or the relating documents should be handled in appropriate ways after type testing. 4.2.2 Test standards, items and methods for type testing 4.2.2.1 Test standards GB17466-1998 “General requirements for enclosures for accessories for household and similar fixed electrical installations” 4.2.2.2 Test item The test items for safety shall include all appropriate items specified in standards. 4.2.2.3 Test methods The type testing shall be carried out according to the methods specified and / or referred in the standards and /or the standards. 4.3 Initial inspection of the factory 4.3.1 Contents of the inspection The contents of factory inspection shall include the factory quality assurance ability assessment and the products consistency check. 4.3.1.1 Assessment of factory quality assurance ability The inspector assigned by the certification body shall carry out the factory quality assurance capability assessment according to the Requirements for Factory Quality Assurance Ability (see appendix 2) and the additional inspection requirements stipulated by CNCA. In addition, the inspection shall cover the requirements of Factory Quality Control Testing Requirements of Enclosures for Accessories for Household and Similar Fixed Electrical Installations (see Appendix 1). 4.3.1.2 Check of consistency of the product The consistency of the product applying for certification shall be checked on the site of production. If more than one application unit are involved in the certification, at least one type/model sample shall be taken from each unit for the product consistency check. The following major points shall be checked: 1) The marking of the products to be certified shall be identical with those indicated in the type testing reports. 2) The construction of products to be certified shall be identical with those of the samples for type testing. 3) The critical components and materials shall be identical with those declared in type testing and confirmed by certification body. The witness tests, if necessary, should be carried out to confirm the safety performance of the products during the factory inspection. 4.3.1.3 Inspection Scope All the products to be certified and processing promises shall be covered for inspection of factory quality assurance ability and of consistency of the products. 4.3.2 Timing of factory inspection Normally, the initial inspection should be implemented after the sample has passed the type testing. The type testing and factory inspection can be implemented at the same time in special cases. The duration of factory inspection shall be determined by the amounts of application units of products to be certified and with the consideration of the scale of the factory. It will normally take about 1 to 4 man-day for each processing premises. 4.4 Evaluation of certification results and approval of certification 4.4.1 Evaluation of certification results and approval of certification The certification body shall be responsible for a general evaluation of the results of type testing and factory inspection and for issuing the certificates to the applicants for the conformed products. One certificate shall be issued for one application unit. The application of the certificates shall comply with the requirements for Regulations for Compulsory Product Certification. 4.4.2 Time frame The time frame for certification means the working days from the acceptance of complete application till the issuance of the certificates, which includes the time of type testing, factory inspection, reports submission after inspection, evaluation of certification results and approval of certificates, etc. Normally, type testing takes 30 working days, not including the time for corrective actions and retest of the non-conformity item(s). The inspection reports should be submitted within 5 working days after inspection. It will be counted from the day when the inspectors complete the inspection on site and receive from the factory the corrective action reports on non-conformities satisfying the requirements. Evaluating certification results and approving the certificates shall normally be within 5 working days. 4.5 Follow-up inspection 4.5.1 The frequency of follow-up inspection The follow-up inspection shall be implemented for once per year. The first follow-up inspection shall normally be implemented 12 months after the certificates being granted. The frequency of inspection should be increased in any of the following cases: 1) The quality of the certified product has seriously problems, or complained by clients and checking concludes that the holder of the certificate shall be responsible for it. 2) The certification body doubts the conformity of the certified product against the requirements for standards of safety with sufficient reasons. 3) Sufficient information indicates that the conformity or the consistency of certified products would be affected due to the changes in organization structure, production condition and the quality system of the manufacturers and/or factories. 4.5.2 Contents of the follow-up inspection The model of follow-up inspection: Re-assessment of factory quality assurance ability + check of consistency of products certified, and if necessary, samples may be taken and tested at the testing laboratories. The certification body shall implement the re-assessment of factories in accordance wi...
008-外snglish(doc)
[下載聲明]
1.本站的所有資料均為資料作者提供和網(wǎng)友推薦收集整理而來,僅供學(xué)習(xí)和研究交流使用。如有侵犯到您版權(quán)的,請來電指出,本站將立即改正。電話:010-82593357。
2、訪問管理資源網(wǎng)的用戶必須明白,本站對提供下載的學(xué)習(xí)資料等不擁有任何權(quán)利,版權(quán)歸該下載資源的合法擁有者所有。
3、本站保證站內(nèi)提供的所有可下載資源都是按“原樣”提供,本站未做過任何改動;但本網(wǎng)站不保證本站提供的下載資源的準(zhǔn)確性、安全性和完整性;同時本網(wǎng)站也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的損失或傷害。
4、未經(jīng)本網(wǎng)站的明確許可,任何人不得大量鏈接本站下載資源;不得復(fù)制或仿造本網(wǎng)站。本網(wǎng)站對其自行開發(fā)的或和他人共同開發(fā)的所有內(nèi)容、技術(shù)手段和服務(wù)擁有全部知識產(chǎn)權(quán),任何人不得侵害或破壞,也不得擅自使用。
我要上傳資料,請點我!
管理工具分類
ISO認(rèn)證課程講義管理表格合同大全法規(guī)條例營銷資料方案報告說明標(biāo)準(zhǔn)管理戰(zhàn)略商業(yè)計劃書市場分析戰(zhàn)略經(jīng)營策劃方案培訓(xùn)講義企業(yè)上市采購物流電子商務(wù)質(zhì)量管理企業(yè)名錄生產(chǎn)管理金融知識電子書客戶管理企業(yè)文化報告論文項目管理財務(wù)資料固定資產(chǎn)人力資源管理制度工作分析績效考核資料面試招聘人才測評崗位管理職業(yè)規(guī)劃KPI績效指標(biāo)勞資關(guān)系薪酬激勵人力資源案例人事表格考勤管理人事制度薪資表格薪資制度招聘面試表格崗位分析員工管理薪酬管理績效管理入職指引薪酬設(shè)計績效管理績效管理培訓(xùn)績效管理方案平衡計分卡績效評估績效考核表格人力資源規(guī)劃安全管理制度經(jīng)營管理制度組織機(jī)構(gòu)管理辦公總務(wù)管理財務(wù)管理制度質(zhì)量管理制度會計管理制度代理連鎖制度銷售管理制度倉庫管理制度CI管理制度廣告策劃制度工程管理制度采購管理制度生產(chǎn)管理制度進(jìn)出口制度考勤管理制度人事管理制度員工福利制度咨詢診斷制度信息管理制度員工培訓(xùn)制度辦公室制度人力資源管理企業(yè)培訓(xùn)績效考核其它
精品推薦
- 1暗促-酒店玫瑰靜悄悄地開 369
- 2終端陳列十五大原則 381
- 3專業(yè)廣告運作模式 343
- 4****主營業(yè)務(wù)發(fā)展戰(zhàn)略設(shè)計 375
- 5中小企業(yè)物流發(fā)展的對策 394
- 6主顧開拓 482
- 7主動推進(jìn)的客戶服務(wù) 342
- 8專業(yè)媒體策劃與購買 372
- 9中遠(yuǎn)電視廣告CF 417
下載排行
- 1社會保障基礎(chǔ)知識(ppt) 16695
- 2安全生產(chǎn)事故案例分析(ppt 16695
- 3行政專員崗位職責(zé) 16695
- 4品管部崗位職責(zé)與任職要求 16695
- 5員工守則 16695
- 6軟件驗收報告 16695
- 7問卷調(diào)查表(范例) 16695
- 8工資發(fā)放明細(xì)表 16695
- 9文件簽收單 16695